Skip to content
Tact-Guard Request demo credentials

Practical production visibility. Evidence-based escalation control.

Connect signal, context, owner, action, and evidence across production routines.

Line A - Shift B
Workcenter 03
Signal Cycle event
Status OverCT
Owner Owner Demo
Signal
Owner
Action
Evidence
read DEMO-2406 - cycle drift detected
route context attached: part, shift, workplace
close evidence remains for follow-up

From signal to verified follow-up.

Tact-Guard keeps production facts, ownership, action, and evidence connected across the shift.

  1. 01
    Signal captured

    Cycle events and OverCT signals stay tied to Line A and Shift B.

  2. 02
    Context attached

    Workorder, workplace, part, and timing context remain visible for review.

  3. 03
    Owner assigned

    Loss Control, Quality, TPM, and 5S follow-up can carry owner and status.

  4. 04
    Evidence closed

    Action plans keep notes, progress, due dates, history, and closure proof together.

Signals visible before the shift discussion is late.

Production monitoring, OverCT explanation, Visual Management, and local Andon behavior connect source facts to practical shopfloor routines.

Cycle pulse Line A

Captures cycle events from logger devices or controlled manual entry with production context.

Visual Management Shift B
OEE source
Configured targets
Line gap
Review
OverCT
Reason capture

Shows KPI, line status, production gap, hourly follow-up, loss boards, and TV-style views.

Losses become managed events, not scattered memories.

Stops, microstops, quality holds, material waits, planned stops, and OverCT records can carry reason, owner, status, escalation, and closure evidence.

Event Area Status Owner
OverCT reason Workcenter 03 Escalated Owner Demo
NOK hold Line A In progress Owner Demo
PM follow-up Workcenter 03 Closed Owner Demo

Quality, TPM, Lean, Engineering, and planning share the same evidence discipline.

Teams can discuss a sanitized dashboard, a fault queue, a 5S deviation, a Time Study result, or an RFQ estimate from visible assumptions.

Quality NOK, audit findings, dispositions, and actions stay connected.
TPM Fault reports, technician queues, triage, RCA/CAPA, PM, and AM routines.
Lean 5S Audits, comparable photos, deviations, owners, due dates, and closure.
Engineering Time Study evidence, Yamazumi balancing, standard work, and RFQ assumptions.
Planning Workorders, routes, norms, calendars, SMED rules, and material warnings.
Actions Owners, RASIC roles, due dates, comments, progress, history, and proof.

Test the demo with credentials prepared for your walkthrough.

Request access through the existing Tact-Guard credential flow. The demo request is reviewed before credentials are activated.

Request demo credentials